RURAL
PERMITS & INSPECTIONS

3015 Menke Circle
Omaha, NE. 68134
(402) 444-7189
FAX:
(402) 444-4963

BUILDING PERMITS

Permit Required
Examples

Application
Procedure

APPLICATIONS

Building Permit

Floodplain
Certificate

Elevation Certificate

 


BUILDING PERMITS

PERMIT REQUIRED EXAMPLES
APPLICATION PROCEDURE

APPLICATIONS

BUILDING PERMIT (.pdf)

BUILDING PERMIT (City of Bennington)(.pdf)


If building in a FLOODPLAIN the following forms are required with Permit:

FLOODPLAIN DEVELOPMENT

ELEVATION CERTIFICATE


If building project envolves excavating an acre and greater the following forms are required with Building Permit

GRADING PERMIT


NE Statute 23-114.04

(1) The county board shall provide for enforcement of the zoning regulations within its county by requiring the issuance of permits prior to the erection, construction, reconstruction, alteration, repair, or conversion of any nonfarm building or structure within a zoned area, and the county board may provide for the withholding of any permit if the purpose for which it is sought would conflict with zoning regulations adopted for the particular district in which the building or structure is situated or in which it is proposed to be erected. All plats for subdivisions in the area outside the corporate limits of cities and villages and outside of an unincorporated area wherein a city or village has been granted subdivision jurisdiction and is exercising such jurisdiction must be approved by the county planning commission.

(2) The county may establish and appoint a county zoning administrator, who may also serve as a building inspector, and may fix his compensation or may authorize any administrative official of the county to assume the functions of such position in addition to his regular duties. The county board may also fix a reasonable schedule of fees for the issuance of permits under the provisions of subsection (1) of this section. The permits shall not be issued unless the plans of and for the proposed erection, construction, reconstruction, alteration, use or change of use, including sanitation, plumbing and sewage disposal, are filed in writing in the building inspector's office and such plans fully conform to all zoning regulations then in effect.

County Zoning Regulation, Section 24

B. Building Permit Required

It shall be unlawful to commence or do any excavating, erecting, constructing, reconstructing, enlarging, altering, or moving of any building or structure or to use or occupy or permit the use of occupancy of any building, land or premises, or construction or connection to water or sewer facilities or part thereof hereafter created, erected, changed, converted, or wholly or partly altered or enlarged in its use or structure until a building permit shall have been issued therefore by the Building Inspector stating that the proposed use of the building or land conforms to this regulation.

The Building Inspector may issue a temporary building permit for uses in any district for the purpose of uses and buildings incidental and required in the construction of a principal permitted use in the district in which it is located and highway construction, provided that such use be of a temporary nature and does not involve the erection of substantial buildings. Such permit shall be granted in the form of a temporary and revocable permit for not more than six months subject to conditions as will safeguard the public health, safety and general welfare.

C. Application for Building Permit.

Written applications on forms prescribed and furnished by the Building Inspector stating such information as may be required for the enforcement of this regulation shall be submitted and shall be accompanied by plans in duplicate, drawn to scale, showing the actual shape and dimensions of the lot to be built upon or to be changed in its use, in whole or in part, the exact location, existing and intended use of each building or structure or part thereof, the number of families or housekeeping units the building is designed to accommodate and when no buildings are involved, the location of the present use and proposed use to be made of the lot, existing and proposed water and sanitary sewer facilities, as may be necessary to determine and provide for the enforcement of this regulation. One (1) copy of such plans shall be returned to the owner when such plans shall have been approved by the Building Inspector together with such building permits as may be granted. All dimensions shown on these plans relating to the location and size of the lot to be built upon, shall be based on actual survey. The lot and the location of the building thereon shall be staked out on the ground before construction is started.

The Building Inspector shall issue a written permit, or denial, thereof, with reasons in writing within fifteen (15) days from the date of the acceptance of the application. Appeal may be made in accordance with Section 25 of this regulation.

Except where an extension has been obtained in writing from the Building Inspector, permits issued shall expire with ninety (90) days if the work described in the permit has not begun or the use applied for has not been established and within one year if the work has not been completed